1/2 Long Lead Lag Shield #4188
SKU: 6625495

$87.25 /each
MRD Lumber
In Stock
In-Store Pick-Up
Delivery Available
Description
This 1/2 in. Long Lead Lag Shield #4188 is designed for use with lag screws, providing a secure anchor point in various materials. The lag shield is suitable for both indoor and outdoor use, ensuring reliable performance in a variety of environments.
- Designed for use with lag screws to provide a secure hold
- Compatible with various base materials for versatile installation
Specifications
- Diameter: 1/2 in.
- Pattern: #4188
- Type: Lag Shield
Product Specifications
Diameter | 1/2 in. |
Pattern | #4188 |
Type | Lag Shield |
